• Site Assessment Survey

    DET SOA 71789 Classroom Audio Visual Installation
  •  /  /
    Pick a Date
  • Part A:

    Display and Mounting Details
  • Browse Files
    Cancel of
  •  
  • Part B:

    Connectivity, Speakers, Power and Data
  • Connectivity

    As part of this contract a wall plate featuring HDMI, VGA, 3.5mm Audio and USB will be supplied as standard. Please advise below if an alterative configuration is required. (fees may apply)
  • Speakers

  • Power

  • Power outlets are required to be positioned within 0.5m of installation locations. All efforts should be made to locate GPO's and connectivity plates as unobtrusively as possible.

  • Data

  • Distance and cable pathway information will need to be provided from existing Network Switch to proposed installation point.

  • Part C:

    Equipment Layout
  • Ultra Short Throw Projectors - Install Layout

  • LCD Panels - Install Layout

  • Part D

    Additional Works
  • No. Removal of existing equipment is not required, we will ensure that the wall and ceiling are clear and ready for new equipment to be installed.

  • Yes. please remove existing equipment (please provide details below)

  • Installation Notes

  • Additional wall structure support/bracing may be required to mount LCD panels and Projectors onto existing walls to ensure the integrity of the installation and safety of end users. If required, such works will be treated as a variation.

    Work areas (WHS): Once work commences within a room, the area is defined and zoned as a Construction site. No one shall enter the room until a Customer Sign-off (Acceptance) has been signed by the end Customer. This is to ensure safe working conditions for everyone.

    Wall types: Projectors and LCD Panels must be securely fixed to the building structure and be installed in a location that does not obstruct use. Please note, vibrations from airconditioners can cause projected images to shake.

    Cancellations/ Delays: Cancellations within 48 hours of installation will be charged a cancellation fee. Any delays on-site due to safety reasons, changes to scope, locating of equipment or as directed by the customer will be charged on a time and materials basis.

    Please ensure products are in the room ready to install prior to technicians arriving on site. Additional fees apply if technicians are required to move product into rooms.

    Testing will be completed on technician laptops unless end users provide a laptop with passcode access.

    End users must make themselves available for basic operational training at the time the installation is completed.

  • Site Summary

  • I hereby declare that the information contained in this Site Assessment Survey is correct.

  •  
  • Should be Empty: