You can always press Enter⏎ to continue
Onsite baseline details submission 

Onsite baseline details submission 

    This form is for sales reps/ installers to complete ONSITE for each upgrade PRIOR to IMPLEMENTATION, to allow us to assess the feasibility of conducting M&V and accessing energy savings incentives.  
27Questions
  • 1

    Before you start you'll need:

    1. Details of the company paying for the upgrade
    2. Details of the location, purpose, metering on the site where the upgrade will be undertaken
    3. An understanding of the major energy using equipment on site
    4. Details of the upgrade you are proposing to undertake

    Press
    Enter
  • 2
    Press
    Enter
  • 3
    If different from the energy saver address, please enter the address where proposed upgrade will take place
    Please Select
    • Please Select
    • Afghanistan
    • Albania
    • Algeria
    • American Samoa
    • Andorra
    • Angola
    • Anguilla
    • Antigua and Barbuda
    • Argentina
    • Armenia
    • Aruba
    • Australia
    • Austria
    • Azerbaijan
    • The Bahamas
    • Bahrain
    • Bangladesh
    • Barbados
    • Belarus
    • Belgium
    • Belize
    • Benin
    • Bermuda
    • Bhutan
    • Bolivia
    • Bosnia and Herzegovina
    • Botswana
    • Brazil
    • Brunei
    • Bulgaria
    • Burkina Faso
    • Burundi
    • Cambodia
    • Cameroon
    • Canada
    • Cape Verde
    • Cayman Islands
    • Central African Republic
    • Chad
    • Chile
    • China
    • Christmas Island
    • Cocos (Keeling) Islands
    • Colombia
    • Comoros
    • Congo
    • Cook Islands
    • Costa Rica
    • Cote d'Ivoire
    • Croatia
    • Cuba
    • Curaçao
    • Cyprus
    • Czech Republic
    • Democratic Republic of the Congo
    • Denmark
    • Djibouti
    • Dominica
    • Dominican Republic
    • Ecuador
    • Egypt
    • El Salvador
    • Equatorial Guinea
    • Eritrea
    • Estonia
    • Ethiopia
    • Falkland Islands
    • Faroe Islands
    • Fiji
    • Finland
    • France
    • French Polynesia
    • Gabon
    • The Gambia
    • Georgia
    • Germany
    • Ghana
    • Gibraltar
    • Greece
    • Greenland
    • Grenada
    • Guadeloupe
    • Guam
    • Guatemala
    • Guernsey
    • Guinea
    • Guinea-Bissau
    • Guyana
    • Haiti
    • Honduras
    • Hong Kong
    • Hungary
    • Iceland
    • India
    • Indonesia
    • Iran
    • Iraq
    • Ireland
    • Israel
    • Italy
    • Jamaica
    • Japan
    • Jersey
    • Jordan
    • Kazakhstan
    • Kenya
    • Kiribati
    • North Korea
    • South Korea
    • Kosovo
    • Kuwait
    • Kyrgyzstan
    • Laos
    • Latvia
    • Lebanon
    • Lesotho
    • Liberia
    • Libya
    • Liechtenstein
    • Lithuania
    • Luxembourg
    • Macau
    • Macedonia
    • Madagascar
    • Malawi
    • Malaysia
    • Maldives
    • Mali
    • Malta
    • Marshall Islands
    • Martinique
    • Mauritania
    • Mauritius
    • Mayotte
    • Mexico
    • Micronesia
    • Moldova
    • Monaco
    • Mongolia
    • Montenegro
    • Montserrat
    • Morocco
    • Mozambique
    • Myanmar
    • Nagorno-Karabakh
    • Namibia
    • Nauru
    • Nepal
    • Netherlands
    • Netherlands Antilles
    • New Caledonia
    • New Zealand
    • Nicaragua
    • Niger
    • Nigeria
    • Niue
    • Norfolk Island
    • Turkish Republic of Northern Cyprus
    • Northern Mariana
    • Norway
    • Oman
    • Pakistan
    • Palau
    • Palestine
    • Panama
    • Papua New Guinea
    • Paraguay
    • Peru
    • Philippines
    • Pitcairn Islands
    • Poland
    • Portugal
    • Puerto Rico
    • Qatar
    • Republic of the Congo
    • Romania
    • Russia
    • Rwanda
    • Saint Barthelemy
    • Saint Helena
    • Saint Kitts and Nevis
    • Saint Lucia
    • Saint Martin
    • Saint Pierre and Miquelon
    • Saint Vincent and the Grenadines
    • Samoa
    • San Marino
    • Sao Tome and Principe
    • Saudi Arabia
    • Senegal
    • Serbia
    • Seychelles
    • Sierra Leone
    • Singapore
    • Slovakia
    • Slovenia
    • Solomon Islands
    • Somalia
    • Somaliland
    • South Africa
    • South Ossetia
    • South Sudan
    • Spain
    • Sri Lanka
    • Sudan
    • Suriname
    • Svalbard
    • eSwatini
    • Sweden
    • Switzerland
    • Syria
    • Taiwan
    • Tajikistan
    • Tanzania
    • Thailand
    • Timor-Leste
    • Togo
    • Tokelau
    • Tonga
    • Transnistria Pridnestrovie
    • Trinidad and Tobago
    • Tristan da Cunha
    • Tunisia
    • Turkey
    • Turkmenistan
    • Turks and Caicos Islands
    • Tuvalu
    • Uganda
    • Ukraine
    • United Arab Emirates
    • United Kingdom
    • United States
    • Uruguay
    • Uzbekistan
    • Vanuatu
    • Vatican City
    • Venezuela
    • Vietnam
    • British Virgin Islands
    • Isle of Man
    • US Virgin Islands
    • Wallis and Futuna
    • Western Sahara
    • Yemen
    • Zambia
    • Zimbabwe
    • Other
    Press
    Enter
  • 4
    Please estimate the SQM of conditioned space for each space type below
    Press
    Enter
  • 5
    NOTE and give the approximate DATE for any of the following that have occurred
    Press
    Enter
  • 6
    NOTE and give the approximate DATE for any of the following that have occurred
    Press
    Enter
  • 7
    Approximately when would the upgrade currently be expected to take place
    -
    Pick a Date
    Press
    Enter
  • 8
    Select the activity planned for each system component in scope
    1 of 12
    Press
    Enter
  • 9
    Please Select
    • Please Select
    • Manual
    • BMS
    Please Select
    • Please Select
    • On/off
    • VAV (Variable air volume)
    Press
    Enter
  • 10
    Press the camera icon below take a photo using your device, and "Next" to upload
    Press
    Enter
  • 11
    Please Select
    • Please Select
    • Heat pump
    • Element
    Please Select
    • Please Select
    • Roof (Open air)
    • Roof (Plant room)
    • Ground (Open air)
    • Ground (Plant room)
    Press
    Enter
  • 12

    Photos of existing units and compressor nameplate photos

    Please use this app and your device camera to take and automatically upload:

    • one photo of all existing external units together; and
    • one photo each of their compressor nameplates

    Press NEXT to UPLOAD each image when you are happy with it.

    Here is an example of what the compressor nameplate photo shoud look like:

    Press
    Enter
  • 13
    Press the camera icon below take a photo using your device, and "Next" to upload
    Press
    Enter
  • 14
    Press the camera icon below take a photo using your device, and "Next" to upload
    Press
    Enter
  • 15
    Press the camera icon below take a photo using your device, and "Next" to upload
    Press
    Enter
  • 16
    Press the camera icon below take a photo using your device, and "Next" to upload
    Press
    Enter
  • 17
    Press the camera icon below take a photo using your device, and "Next" to upload
    Press
    Enter
  • 18
    Press the camera icon below take a photo using your device, and "Next" to upload
    Press
    Enter
  • 19
    Press the camera icon below take a photo using your device, and "Next" to upload
    Press
    Enter
  • 20
    Press the camera icon below take a photo using your device, and "Next" to upload
    Press
    Enter
  • 21
    Press the camera icon below take a photo using your device, and "Next" to upload
    Press
    Enter
  • 22
    Press the camera icon below take a photo using your device, and "Next" to upload
    Press
    Enter
  • 23
    Press the camera icon below take a photo using your device, and "Next" to upload
    Press
    Enter
  • 24
    Please provide the NMIs and details for ALL electricity meters at the project site (these can be found on the meter or the electricity bill)
    Press
    Enter
  • 25
    Press the camera icon below take a photo using your device, and "Next" to upload
    Press
    Enter
  • 26
    Please provide the meter number and major equipment connected to each gas meter on site
    Press
    Enter
  • 27
    Press the camera icon below take a photo using your device, and "Next" to upload
    Press
    Enter
  • 28
    If project costs are not yet finalised an approximate value is okay.
    Press
    Enter
  • 29
    Press
    Enter
  • 30
    Please estimate the total annual energy savings for the project.
    Press
    Enter
  • 31
    Briefly describe if applicable
    • Huge
    • Large
    • Normal
    • Small
    Ok
    quoteCreated with Sketch.
    Ok
    Press
    Enter
  • 32
    Energy savings scheme eligibility check
    Press
    Enter
  • 33
    Press
    Enter
  • Should be Empty:
3. On site M&V  Onsite Baseline information (all tech) V_0.03
[Edit]
Question Label
1 of 33See AllGo Back
close