ACTIVITIES_REPORT
Date
*
-
Month
-
Day
Year
Date
1
2
3
4
5
6
7
8
9
10
11
12
:
Hour
00
10
20
30
40
50
Minutes
AM
PM
AM/PM Option
CREW - CODE
*
Address
*
Address
MPS
State / Province
Postal / Zip Code
MDU
Laterals (PCD) H50-01-00-19
Qty
Isolators H50-01-00-18
Qty
Access Panels
Qty
Catenary Wire M50-01-00-02
Qty
Metal Duct H50-01-00-29
Qty
Plastic Duct H50-01-00-27
Qty
Security Box H50-01-00-15
Qty
Wall penetration M50-02-00-02
Qty
Floor penetration M50-02-00-04
Qty
Installation of cable tray M50-01-00-01
Qty
Network
Pipe Proving M03-01-01-03
Hrs
Haul CX50 H03-03-00-06A
Meters
Removal Aerial KS H20-00-01-54
Qty
Removal Non Aerial KS H20-00-01-53
Qty
Aerial Tap H20-00-01-55
Qty
Non Aerial Tap H20-00-01-56
Qty
Aerial PB H20-00-01-62
Qty
Non Aerial PB H20-00-01-61
Qty
Installation Aerial RF Splice H20-00-01-63
Qty
Installation Non Aerial RF Splice H20-00-01-64
Qty
Replacement of aerial tap H20-01-02-01
Qty
Replacement of NON aerial tap H20-01-02-03
Qty
Reconfigure output of aerial directional coupler or aerial network splitter in an existing network H20-00-01-57
Qty
Reconfigure output non-aerial directional coupler or network splitter in existing network H20-00-01-58
Qty
Removal of aerial power blocker in existing network H20-00-01-60
Qty
EOL - Extras
EOL Test H20-00-01-43
Qty
pole riser M51-01-01-03
Qty
H03-03-00-07A Installation of hardline in an existing riser on a pole
Qty
Extra time M09-01-01-07
Hrs
Locate buried manholes/pits M03-02-01-09
Hrs
Removal of hardline in underground duct H03-03-00-08
Hrs
Civils - Underground
Notes - Photos
NOTES
*
PHOTO OF TAILGATE FORM AND PHOTO OF CREW IS REQUIRED
PHOTOS
*
Browse Files
Cancel
of
Signature
*
Submit
COST Laterals (PCD) H50-01-00-19
Qty
COST Isolators H50-01-00-18
Qty
COST Access Panels
Qty
COST Catenary Wire M50-01-00-02
Qty
COST Metal Duct H50-01-00-29
Qty
COST Plastic Duct H50-01-00-27
Qty
COST Security Box H50-01-00-15
Qty
COST Wall penetration M50-02-00-02
Qty
COST Floor penetration M50-02-00-04
Qty
COST Installation of cable tray M50-01-00-01
Qty
COST Haul CX50 H03-03-00-06A
Meters
COST Removal Aerial KS H20-00-01-54
Qty
COSTRemoval Non Aerial KS H20-00-01-53
Qty
COST Aerial Tap H20-00-01-55
Qty
COST Non Aerial Tap H20-00-01-56
Qty
COST Aerial PB H20-00-01-62
Qty
COST Non Aerial PB H20-00-01-61
Qty
COST Installation Aerial RF Splice H20-00-01-63
Qty
COST Installation Non Aerial RF Splice H20-00-01-64
Qty
COST EOL Test H20-00-01-43
Qty
COST pole riser M51-01-01-03
Qty
COST Extra time M09-01-01-07
Hrs
COST Pipe Proving M03-01-01-03
Hrs
COST Replacement of aerial tap H20-01-02-01
Qty
Cost Replacement of NON aerial tap H20-01-02-03
Qty
Cost H03-03-00-07A Installation of hardline in an existing riser on a pole
Qty
Cost Locate buried manholes/pits M03-02-01-09
Hrs
Cost Removal of hardline in underground duct H03-03-00-08
Hrs
Cost Reconfigure output of aerial directional coupler or aerial network splitter in an existing network H20-00-01-57
Qty
Cost Reconfigure output non-aerial directional coupler or network splitter in existing network H20-00-01-58
Qty
Cost Removal of aerial power blocker in existing network H20-00-01-60
Qty
TOTAL_SOR_COST
Hrs
Should be Empty: