1
Regulation 6 requires a BCA to record:
how it ensures that its policies, procedures and systems are effectively implemented
the decisions it makes under its policies, procedures and system
the reasons for and outcomes of its decisions.
Previous
Next
Submit
Press
Enter
2
Date of Inspection
*
This field is required.
-
Date
Month
Day
Year
1
2
3
4
5
6
7
8
9
10
11
12
5
1
2
3
4
5
6
7
8
9
10
11
12
Hour
00
10
20
30
40
50
30
00
10
20
30
40
50
Minutes
AM
PM
AM
AM
PM
Previous
Next
Submit
Press
Enter
3
Ceiling Insulation
NZBC H1 2.0
Yes-It Complies NZBC H1 2.0
No- It does not comply to NZBC H1 2.0
Yes-It Complies NZBC H1 2.0
No- It does not comply to NZBC H1 2.0
Explain in your attached notes what component of the code it applies to and why It does not comply
Previous
Next
Submit
Press
Enter
4
Visual awareness
NZBC G7 2.0
Yes-It complies to NZBC G7 2.0
No- It does not comply to NZBC G7 2.0
Yes-It complies to NZBC G7 2.0
No- It does not comply to NZBC G7 2.0
Explain in your attached notes what component of the code it applies to and why It does not comply
Previous
Next
Submit
Press
Enter
5
Stairs/Balustrades
NZBC D1 4.0,B1 2.0,F4 1.0 & 1.2 and table 1
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
6
Smoke alarms
NZBC F7 3.1-3.2
Passed
Failed
Not Applicable
Previous
Next
Submit
Press
Enter
7
Ventilation to habitable rooms
NZBC G4 1.3-1.5
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
8
Safety glazing
NZBC F2 1.0
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
9
Floor finishes
NZBC E3 3.1 & 3.2
Completed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
10
Wall finishes sealed
NZBC E3 3.1.2
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
11
WC/Bath/Basin Shower seals
NZBC E3 3.2.2 & Figure 3
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
12
Extract fan to exterior
NZBC G4 1.3.2
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
13
Waste trap vented
NZBC G13 5.0
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
14
Window stays
NZBC G4 1.2.3 and F4 2.0
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
15
Vermin proofing
NZBC G3 1.6 & 2.2.3
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
16
Non return valve in Shower
NZBC G12 3.0,3.3.3 & 3.5
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
17
Wall Finishes
NZBC E3 3.1.2
Completed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
18
Floor finishes and containment
NZBC E3 3.1 & 2.1
Completed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
19
Extract fan to exterior
NZBC G13 5.0
Completed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
20
Waste traps vented
NZBC G13 5.0
Completed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
21
Dishwasher/Garbage
NZBC G13 3.0
Completed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
22
Stove /Hob clearance
NZBC C 1.3.1, NZS 5261 2.6.2.6,2.6.3.4,2.7.1.1,2.7.1.2 and Table 16b & 17
Completed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
23
Wall finishes sealed
NZBC E3 3.1.2
Completed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
24
Floor Finishes
NZBC E3 3.1 & 2.1
Completed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
25
Extract fan to exterior
NZBC G4 1.3.2
Completed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
26
Tub sealed and secured
NZBC E3 3.2.2 & G2 1.0
Completed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
27
Vermin proofing
NZBC G3 1.6 & 2.2.3
Completed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
28
Upstairs Bathroom
Previous
Next
Submit
Press
Enter
29
Safety Glazing
Completed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
30
Floor Finishes
Completed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
31
Extractor Fan to Exterior
Completed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
32
Wall Finishes
Completed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
33
WC/Bath/Basin Seals
Completed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
34
Waste Vented
Completed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
35
Windows Stays
Completed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
36
Vermin Proofing
Completed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
37
Non Return Valve Shower
Completed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
38
Step down from interior
NZBC E2 7.1 & Figure 14
Completed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
39
Drain outlet
NZBC E2 8.5.6
Completed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
40
Overflow drain
NZBC E2 8.5.6
Completed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
41
Waterproof membrane
Completed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
42
Timber size/spacing/span
NZS3604:2011 7.4
Completed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
43
Downpipes discharging on to deck or roof
NZBC E2 8.1.6
Completed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
44
Balustrade
NZBC B1 2.0,F4 1.0 &1.2 and table 1
Completed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
45
Timber Treatment
Completed
Failed
Previous
Next
Submit
Press
Enter
46
Connections S/S or galv
NZS3604 4.4.1 and table 4.1
Completed
Failed
Previous
Next
Submit
Press
Enter
47
Steps
NZBC D1 4.0
Completed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
48
Handrail height
NZBC D1 6.0
Completed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
49
Deck slope 1.5 degrees
NZBC E2/AS1 8.5.1
Completed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
50
Deck washdown
NZBC E2 7.1.1,7.2 & Figure 15
Completed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
51
Spreaders
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
52
Spouting clearance
NZBC E1/AS1 clause 4.0 & 3.6
Completed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
53
Flashings
Remember you will need a Record of Work from an LBP roofer for the work to confirm the house is fit for purpose
Completed
Failed
Previous
Next
Submit
Press
Enter
54
Downpipes -sizing and fixings
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
55
Adequate weather seal
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
56
Rebate to door
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
57
Fire Rated Switch Boxes
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
58
Penetrations through firewall as per plan
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
59
Fire Separation
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
60
Downpipes-sizing and fixings
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
61
Cladding painted
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
62
Vermin proofing
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
63
Penetrations sealed
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
64
Windows scribers
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
65
Flashings
As per E2/AS1 http://www.building.govt.nz/userfiles/file/publications/building/compliance-documents/e2-external-moisture-effective-24-december-2011.pdf
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
66
Base ventilation & access
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
67
Vertical & horizontal control joints
Refer Consented plans to confirm Manufacturers specifications
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
68
Floor clearance
As per E2/AS1 http://www.weathertight.org.nz/new-buildings/detail-solutions/floor-levels-and-clearances/
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
69
External cladding
http://www.weathertight.org.nz/new-buildings/detail-solutions/floor-levels-and-clearances/
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
70
ORG/Gully haunched
http://www.weathertight.org.nz/new-buildings/detail-solutions/floor-levels-and-clearances/ https://web.microsoftstream.com/video/4ecd8979-1729-4f91-a70a-18e076c19ddc
Passed
Failed
Not applicable
Other
Previous
Next
Submit
Press
Enter
71
ORG/Gully correct height
150mm lower than the lowest internal outlet eg shower, toilet
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
72
Cladding clearance
http://www.weathertight.org.nz/new-buildings/detail-solutions/floor-levels-and-clearances/
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
Should be Empty:
Question Label
1
of
72
See All
Go Back
Submit