1
Building Weatherproof
A precaution due to the moisture content issues with the plasterboard.
Pass
Fail
N/A
Previous
Next
Submit
Press
Enter
2
Exterior joinery fitted
Pass
Fail
N/A
Previous
Next
Submit
Press
Enter
3
Moisture content
NZBC E2/AS1 10.0 NZS3602:2003 110.2- 4
Pass
Fail
N/A
Previous
Next
Submit
Press
Enter
4
Pressure seals
NZBC E2/AS1 9.1.6
Pass
Fail
N/A
Previous
Next
Submit
Press
Enter
5
Internal Bottom Plate fixings
NZS 3604:2011 6.11.9.1 & 7.5.12, Table 7.5 & 8.7.5.2 & table 8.19 & manufacturers specs
Pass
Fail
N/A
Previous
Next
Submit
Press
Enter
6
Fire rated bottom plate fixings
Pass
Fail
N/A
Previous
Next
Submit
Press
Enter
7
Studs / nogs @ correct centres
NZS3604:2011 8.5,tables 8.2-8.4, figure 8.2 & 8.5.4
Pass
Fail
N/A
Previous
Next
Submit
Press
Enter
8
Timber sizes/spans
NZS3604:2011 table 7.1,table 8.2 and table 10.2
Pass
Fail
N/A
Previous
Next
Submit
Press
Enter
9
Framing notches
NZS3604:2011 8.5.1.7
Pass
Fail
N/A
Previous
Next
Submit
Press
Enter
10
Timber Treatment
NZS3604:2011 4.1 & NZS3602
Pass
Fail
N/A
Previous
Next
Submit
Press
Enter
11
Lintel Straps
NZS3604:2011 8.6.1.7-8.6.1.9 & figure 8.12
Pass
Fail
N/A
Previous
Next
Submit
Press
Enter
12
Truss spacing/tiedowns
NZS3604:2011 Table 10.12 & figure 10.21
Pass
Fail
N/A
Previous
Next
Submit
Press
Enter
13
Secondary bracing ceilings/roofs
NZS3604:2011 10.4.3 & 10.2.1.9--10.2.1.13.3
Pass
Fail
N/A
Previous
Next
Submit
Press
Enter
14
Dragon ties/ plane braces
NZS3604:2011 10.3
Pass
Fail
N/A
Previous
Next
Submit
Press
Enter
15
Purlin fixings
NZS3604:2011 10.2.1.16.1 and Table 10.9 & 10.10
Pass
Fail
N/A
Previous
Next
Submit
Press
Enter
16
Ceiling batten fixings
NZS3604:2011 13.2 & table 13.1
Pass
Fail
N/A
Previous
Next
Submit
Press
Enter
17
Stair pitch and headroom
NZBC D1
Pass
Fail
N/A
Previous
Next
Submit
Press
Enter
18
Ground clearances
NZS3604:2011 7.5.2 & E2/AS1 10.3.5
Pass
Fail
N/A
Previous
Next
Submit
Press
Enter
19
Nailplates
NZS3604:2011 8.7.3.4 & figure 8.16
Pass
Fail
N/A
Previous
Next
Submit
Press
Enter
20
Deck joists@ 400mm ctres
NZBC E2/AS1 8.5.5.1
Pass
Fail
N/A
Previous
Next
Submit
Press
Enter
21
Deck level stepdown (100mm)
NZBC E2/AS1 7.1
Pass
Fail
N/A
Previous
Next
Submit
Press
Enter
22
Deck supports
125X125 piles or 140mm dia NZS3604:2011 6.4.2
Pass
Fail
N/A
Previous
Next
Submit
Press
Enter
23
Deck bracing
Over 2.000 metres wide NZS3604:2011 7.4.2
Yes
No
N/A
Previous
Next
Submit
Press
Enter
24
Barrier fixings
NZBC B2 All exposed structural fixings need to endure 50 year durability therefore Stainless is the easiest way if achieving this.
Yes
No
N/A
Previous
Next
Submit
Press
Enter
25
Substrate fixings for membrane
As per manufacturers specifications. Remember to consider the product which will be over the membrane ply?
Pass
Fail
N/A
Previous
Next
Submit
Press
Enter
26
Deck overflows
NZBC E2/AS1 8.5.6 & 8.5.10
Pass
Fail
N/A
Previous
Next
Submit
Press
Enter
27
Deck wash down gap
NZBC E2/AS1 7.1.1, 7.2 & figure 15
Pass
Fail
N/A
Previous
Next
Submit
Press
Enter
28
Deck slope
NZBC E2/AS1 8.5
Pass
Fail
N/A
Previous
Next
Submit
Press
Enter
29
Decking supported clear of membrane
NZBC E2/AS1 7.3.1.1 & 7.3.1.2
Pass
Fail
N/A
Previous
Next
Submit
Press
Enter
30
Ideas for photos; plus provide written evidence.
Previous
Next
Submit
Press
Enter
Should be Empty:
Question Label
1
of
30
See All
Go Back
Submit